Thrivikramji.com | In fact there is a slight hint to a worsening of power supply if the national grid is not ready to support Kerala.
7866
post-template-default,single,single-post,postid-7866,single-format-standard,ajax_fade,page_not_loaded,,transparent_content,qode-theme-ver-13.9,qode-theme-bridge,disabled_footer_top,disabled_footer_bottom,wpb-js-composer js-comp-ver-5.4.7,vc_responsive
 

In fact there is a slight hint to a worsening of power supply if the national grid is not ready to support Kerala.

In fact there is a slight hint to a worsening of power supply if the national grid is not ready to support Kerala.

Very interestingly the electricity minister wished away the power situation to the nature and as a natures gift. While what he sidelined was the power highway that remains unbuilt to connect Kerala grid to kudankulam outlet to Kerala.
In fact there is a slight hint to a worsening of power supply if the national grid is not ready to support Kerala.
I am really surprised to note the pretension of no urgency to such issues even in the floor of the assembly.
By the way the people sitting on either side of the isle are immensely responsible for the no completion of the power highway from kudankulam to Kerala.

Share Button
No Comments

Post A Comment