Thrivikramji.com | Begining of Neyyar Metamorphosis: Dr.Thrivikramji.K.P.
6184
post-template-default,single,single-post,postid-6184,single-format-standard,ajax_fade,page_not_loaded,,transparent_content,qode-theme-ver-13.9,qode-theme-bridge,disabled_footer_top,disabled_footer_bottom,wpb-js-composer js-comp-ver-5.4.7,vc_responsive
 

Begining of Neyyar Metamorphosis: Dr.Thrivikramji.K.P.

Begining of Neyyar Metamorphosis: Dr.Thrivikramji.K.P.

The Neyyar tin Trivandrum dist. attracted an indepth assessment in the mid 80’s by a team of researchers from the Univ. of Kerala. Uncontrolled removal of channel sand and flood plain mud from on land drove the river to literal death. Aquatoic diversity of life nearly narrowed. Channel shape disfigured.and even during the base flow in summer river crossings became treacherous.

[scribd id=26874771 key=key-xrmewjd06vjxxs877x9 mode=scroll]

Share Button
No Comments

Post A Comment